It's been exactly one year since my last update on Project Dualcopter. On 20th of October 2016 I've posted that there was a progress. Now, 12 months later, I once gain report, that there was a progress…. That was slow….
- I've finally installed control surfaces and servos
- I've finally decided where LiPo will go: to the top of the whole stack. I want CoG as far from control surfaces as possible. They will not generate much force, so I need as much torque as possible. So, long lever FTW
- My daughter called it Flying Bucket. Makes sense, right?
- Plans for next week: battery mount
Leave a Reply